Milepost
Track charts, reimagined

Milepost

The ultimate track chart for railfans.

Every subdivision drawn the way the railroad sees it: tracks, control points, signals, crossings and speed limits by the milepost. And it’s tied to the real map, so you always know what you’re looking at from the trackside.

PORTLAND SUB · BW 26 → BW 22 TIMETABLE WEST → BW 26 BW 25 BW 24 BW 23 BW 22 Shawsheen R. Industry track Track 2 Track 1 CPF AS ? Pearson St Andover TRAINS CSX M426 · Selkirk → Rigby ▸ MAX MPH 60 / 40 50 / 40 60 / 40

Everything a track chart tells you, and more

Built around the subdivision, like the railroad’s own charts, with the history, the trains and the map layered on top.

Subdivision first

One continuous chart per subdivision, by milepost, with historic lines and tenant railroads overlapping where they really do.

Time travel

Slide back through the years to see sidings, stations and interlockings that are gone, with uncertain history marked “?”.

Chart and map, in sync

Every item on the chart has a place on the real map. Scroll one and the other follows, over aerial imagery from any year.

Train symbols

Follow M426 from Selkirk to Rigby, or the Haverhill Line trips: each symbol’s route across every subdivision it runs on.

Running times that keep up

Timetable or railfan times between stations. Change a speed limit and the affected times are re-estimated and flagged for review.

Edited with care

Editors draw on the chart and correct the map. Moderators review changes, and every item keeps its source.

Now on the chart

CSX Portland Subdivision, around Andover

North Andover to past Lowell Junction: transcribed from the employee track chart, matched to OpenStreetMap, over MassGIS aerials from 1995 to 2025.

BW 28 → PLD 108Mileposts covered
6Aerial years, plus USGS topo
63Timetable stations
Sign in to open it